Featured
Shipping without a status meeting
The release notes were the meeting. Everything else was a rehearsal.
Read our blog
Pieces from the desk on engineering, design, product, and the tools people finish.
Featured
The release notes were the meeting. Everything else was a rehearsal.
Engineering
The most expensive pipeline is the one only one person can explain on a Friday.
Engineering
If only one person can explain the pipeline, the pipeline is already late.